Englewood Cliffs Projects Status
Englewood Cliffs Projects Status
(This page will be updated a day before any scheduled Council meeting)
Project Description:
The scope of the project consists of the resurfacing of Laurie Drive from Johnson Avenue to Roberts Road approximately 2,200 linear feet. The improvements include milling and paving of the roadway, various traffic improvements, spot repair of curbing, resetting of castings, installation of traffic stripes and marking and other incidental roadway items.
| Contractor | Award Amount | Target Completion | Last Updated |
|---|---|---|---|
| Your Way Construction, Inc. | $258,290.43 | 11/30/2026 | 10/13/2026 |
Contract awarded. Pre-construction meeting was held on 10/01/2026. Construction started on 10/08.
Project Description:
The scope of the project consists of second phase of Borough-wide Sanitary Sewer Improvements to address the Inflow and Infiltration (I&I) issues. It consists of 12 distinct repair areas.
| Contractor | Award Amount | Target Completion | Last Updated |
|---|---|---|---|
| National Water Main Cleaning Company | $1,091,150.00 | 10/16/2026 | 10/13/2026 |
Ground breaking was held on 08/03/2026. Sewer video is completed. Work in progress.
SANITARY SEWER PHASE 1 MAP
SANITARY SEWER PHASE 1 IMPROVEMENTS SUMMARY
Project Description:
The scope of the project consists of reconstruction of last portion of Floyd Street with a total linear length of approximately 1,150 Ft. The improvements include milling and paving of the roadway, reconstruction of the handicap ramps according to the ADA standards and installation of detectable warning surfaces, spot repair of curbing, resetting of castings, installation of traffic stripes and marking and other incidental roadway items. Fastech is responsible for Construction Management and Inspection.
| Contractor | Award Amount | Completion | Last Updated |
|---|---|---|---|
| D&L Paving Contractors, Inc. | $170,176.35 | 09/24/2026 | 10/13/2026 |
Work completed, waiting for NJDOT inspection.
Project Description:
The scope of the project consists of resurfacing of seven Roads in the 2026 Road Resurfacing Program final list with a total linear length of approximately 6,000 Ft. The improvements include milling and paving of the roadway, spot repair of curbing, resetting of castings, installation of traffic stripes and marking and other incidental roadway items.
| Contractor | Award Amount | Completion | Last Updated |
|---|---|---|---|
| Riverside Co-Op(DLS) | $398,249.07 | 09/08/2026 | 10/13/2026 |
|
Road Name |
Road Limit |
Status | |
| 1 | 2nd Street | Irving Ave to Bor Limit | Paved |
| 2 | Ash Street | Jenkins Dr to Dead End | Paved |
| 3 | Center Street | Jenkins Dr to VA Ave | Paved |
| 4 | Kahn Ter | Hudson Ter to Sylvan Ave | Paved |
| 5 | Clendinen Pl | Hudson Ter to Sylvan Ave | Paved |
| 6 | New Street | Hudson Ter to Sylvan Ave | Paved |
| 7 | Sherwood Ave | Hudson Ter to Sylvan Ave | Paved |
Project completed and closed.
2026 ROADWAY IMPROVEMENTS MAP
Project Description:
The scope of the project consists of first phase of Borough-wide Sanitary Sewer Improvements to address the Inflow and Infiltration (I&I) issues. The targeted area is on Hudson Terrace between Kahn Terrace and Sherwood Avenue. There will be two 10 ft areas of point lining and one manhole to manhole lining 237 ft long.
Following is the status of the two 10 ft point linings and one 237 ft lining;
| Contractor | Award Amount | Completion | Last Updated |
|---|---|---|---|
| Montana Construction | $51,100 | 06/01/2026 | 10/13/2026 |
Both parts of Phase 0, which are the emergency repairs, were completed.
SANITARY SEWER PHASE 0 MAP
Project Description:
The scope of the project consists of construction of a new roadway on unimproved 5th street from border of the borough to the dead end behind 10 Bayview Avenue. Initial investigation is in progress.