Teaneck Projects Status

(This page will be updated a day before any scheduled Council meeting)

Project Description:
The scope of the project consists of resurfacing of all Roads in the 2025 Road Resurfacing Program final list with a total linear length of around 2 miles. The improvements include milling and paving of the roadway, reconstruction of the handicap ramps according to the ADA standards and installation of detectable warning surfaces, resetting of castings, installation of traffic stripes and marking and other incidental roadway items. 

Contractor Award Amount Target Completion Last Updated
TBD $- TBD 06/15/2026

Bids were released and opened on 06/09/2026. Apparenet Lowest Bidder is DLS Contracting Inc. with Total Bid of $1,198,091.20. Waiting for Award of contract.

Here is the list of Roadways to be paved under 2025 Roadway Resurfacing Program:

Roadways to be paved under 2025 Roadway Resurfacing Program

 

 Road Name

 Road Limit

 Status

 1  Terhune St  Larch Ave to Elm St   In Design
 2  Windsor Road  Cedar Ln to Beverly Rd   In Design
 3  Beverly Road  Garrison Ave to Williams Ave   In Design
 4  Claremont Avenue  Garrison Ave to Belle Ave   In Design
 5  Billington Road  Windsor rd to Magnolia Rd   In Design
 6  E Laurelton Pkwy  Belle Ave to Magnolia Rd   In Design
 7  Essex Road  Rutland Ave to W Englewood Ave   In Design
 8  Rutland Ave  Essex Rd to Hudson Rd   In Design
 9  Berkeley Street  Manhattan Ave to Dead End   In Design
 10  Church Street  Teaneck rd to Alicia Ave   In Design
 11  Summit Avenue  Robinson St to Prospect terr   In Design
 12  Alpine Drive  E lawn Dr to Midwood Rd   In Design
 13  Salem street  Lindbergh Blvd to End of street   In Design
 14  Howard Street  Lindbergh Blvd to Dead End   In Design
 15  George Street  Lindbergh Blvd to Dead End   In Design
 16  John Street  Fycke Ln to Washington St   In Design
 17  Johnson Court  Johnson Ave to Dead End   In Design
 A  Woods Rd  Windsor Rd to Grace Terr   In Design
 B  Bedford Avenue  Arlington Ave to Teaneck Rd   In Design
 C  Club Rd  Cedar Ln to Bennett Rd   In Design

Project Description:
The scope of the project consists of resurfacing of all Roads in the 2024 Road Resurfacing Program final list with a total linear length of over 3 miles. The improvements include milling and paving of the roadway, reconstruction of the handicap ramps according to the ADA standards and installation of detectable warning surfaces, resetting of castings, installation of traffic stripes and marking and other incidental roadway items. The scope includes full depth reconstruction of Hemlock Drive North including new drainage and tie-in to the town drainage system.

Contractor Award Amount Target Completion Last Updated
D&L Paving Contractors, Inc. $1,683,741.38 06/30/2026 06/15/2026

Milling and paving on Golf, Fabry and Herrick completed this week.
Here is the list of Roadways to be paved under 2024 Roadway Resurfacing Program:

Roadways to be paved under 2024 Roadway Resurfacing Program

 

Road Name

Road Limit

Status
1 Suffern Rd River Rd. to Wilson Ave. Completed
2 Magnolia Rd Billington Rd. to E. Laurelton Pkwy. Completed
3 Princeton Rd E. Laurelton Pkwy Intersection Completed
4 Somerset Rd Sunderland Rd. to Wendel Pl. Completed
5 Hanover St Winthrop Rd. to Dead End Completed, pending punch list items
6 Ogden Ave Rugby Rd. to Sussex Rd. Completed, pending punch list items
7 Churchill Rd Rugby Rd. to Sussex Rd. Completed
8 Van Buskirk Rd Teaneck Rd. to Van Cortlandt Ter. Completed
9 E. Englewood Ave House #56 to House #66 Completed
10 W. Englewood Ave Queen Anne Rd. to Hill St. Completed
11 Selvage Ave Margaret St. to Stasia Rd. Completed
12 Farragut Ct Farragut Dr. to Dead End Completed
13 Werner Pl Teaneck Rd. to Prince St. Completed
14 Ridgeway St Cherry Ln. to Edgemont Pl. Completed
15 Broad St Cedar Ln. to Merrison St. Completed
16 Sandburg Ct Drainage Glenpointe @ Lucy Ave. Easement Completed
17 Washington St Glenwood Ave. to Dead End Completed
18 Fabry Terr Glenwood Ave. to Kilmurray Dr. Completed
19 Herrick Ave Mildred St. to Albin St. Completed
20 Pine St Queen Anne Rd. to Palmer Ave. Completed, pending punch list items
21 Cane St Palmer Ave. to Bogota Border Completed
22 Walnut St Teaneck Rd. to Lees Ave. Completed
23 Maple St Teaneck Rd. to Lees Ave. Completed
24 John St 541 John St. to Grant Ter. Completed
A Ward Plaza, Eastbound lane Teaneck Rd. to 30 Ward Plaza Completed
B Golf Ct Teaneck Rd. to Club Rd. Completed
C Golf Ct Club Rd. to Country Club Dr. Completed
D Fayette St Sunderland Rd. to Grenville Ave. Completed

Project Description: The scope of the project consists of development of engineering plans and related construction management and inspection services for Construction of Brooks Park restroom. The new Restrooms will be brand new prefab 9 Feet 4 inches by 20 Feet structure exactly like the one installed in Phelps Park, with 3 restrooms, one for each gender, one for family and a storage area, utilities and other incidental items.

Contractor Award Amount Target Completion Last Updated

Thomas & Sons Builders LLC dba Develop Builders

$307,373.00 06/30/2026 06/15/2026

Modified shop drawings were approved. Waiting for building. 

Project Description:The scope of the project consists of construction of Griggs Avenue, Van Buren Avenue and Herrick Avenue from Palisade Avenue to dead end by Herrick Park. The improvements include full construction of the roadways including curbs, base construction and paving, installation of traffic stripes and marking and other incidental roadway items.

Contractor Award Amount Target Completion Last Updated

DLS Contracting, Inc.

$264,236.00 06/30/2026 06/15/2026

Construction was started and concrete work was completed. The project will be completed by next week.

Project Description:The scope of the project consists of the roadway improvements to Bilton Street, Livingston Place, and Clinton Place. The improvements include milling and paving, spot repairs of curbs and driveway aprons, installation of bicycle-safe grates and N-ECO curb pieces, addition of ADA-compliant curb ramps, and new pavement markings.

Contractor Award Amount Target Completion Last Updated

DLS Contracting, Inc.

$170,000.00 06/30/2026 06/15/2026

Construction started and will be finished by next week.

Project Description:
The scope of the project consists of structural inspection of the pedestrian bridge over Palisade Avenue, Windsor Road and CSX Railroad. The project also include design and construction of prioirty repairs. The pedestrian bridge structure consists of a five span, simply supported through-girder bridge supporting a 7’-3” wide, 6” thick concrete deck, transverse floorbeams span between the main steel girders. The bridge servers as a connection bewteen Windsor Road and Palisades Avenue, crossing over three railroad tracks used by CSX transportation railroad.

Last Updated: 06/15/2026

Plans are completed for the priority repair. Negotiating escrow with CSX. Letter was sent to Colliers.

Project Description:
The scope of work involves the design and construction management of a 90 ft. synthetic turf multipurpose field. The field could be used for baseball, softball, football, full size soccer or two U9 soccer fields through multi-striping. 

Last Updated: 06/15/2026

Preliminary work has started. Will have a stakeholder meeting soon.

Project Description: The scope of the project consists of development of engineering specifications and related construction management and inspection services for installation of High Volume Low Speed Fans in Richard Rodda Community Center.

Last Updated: 06/15/2026

Specifications were submitted to the Town for review, approval and advertising.

Project Description:
The scope of the project consists of 2 main amenities as described below.
Replacement of Children Playground: Removal of existing Playground equipment, install new playground equipment, new playground surface and installation of other site amenities for two separate play areas. One for 2-5 years old and another for 5-12 years old children.
New Restroom: Installation of a new prefab restroom structure, Construction of concrete pad, and all relevant plumbing, electrical and drainage.
General site improvements such as access walkways, landscaping, asphalt surfacing, site restoration, grading and drainage and other incidental items are also included in the scope.

Last Updated: 06/15/2026

Bid was released, opening on 07/07/2026.

Project Description:
The scope of work includes the design, Geotech testing management, and construction management for the installation of 9 bioswale to improve stormwater management, enhance water quality, and promote ecological benefits. The bioswale will be designed to capture runoff, filter pollutants, and allow water infiltration into the soil.

Contractor Award Amount Completion Last Updated

A-Tech Concrete Co. Inc.

$258,670.00 05/30/2026 06/15/2026

Construction completed. Final DEP inspection was done and Maintenance Plan was sent to DEP and DPW.

Project Description:
The scope of the project consists of construction of a 1,000 Sq. Ft Water Splash Pad at Phelps Park right next to the new restroom. The splash pad will be surrounded by a 5 ft wide concrete deck with various site amenities like benches and trash receptacles and an access walkway to get to the Splash Pad.

Contractor Award Amount Completion Last Updated
Green Valley Group Inc. $346,750.00 05/25/2026 06/15/2026

Project Completed and closed.

Project Description:The scope of the project consists of the resurfacing of Palisades Avenue from Tryon Avenue West to Dead End, Tryon Avenue West from Palisades Avenue to Queen Anne Road and Galway Place from Palisades Avenue to Dead End. The improvements include milling and paving of the roadway, various traffic improvements, reconstruction of the handicap ramps according to the ADA standards and installation of detectable warning surfaces, resetting of castings, installation of traffic stripes and marking, spot repair of concrete curb and sidewalk, replacement of curb piece with type N – ECO, Drainage improvements and other incidental roadway items.

Contractor Award Amount Completion Last Updated
Cifelli & Sons $ 281,579.25 04/30/2026 06/15/2026

Project is completed. Closeout in progress.

Project Description:
The scope of work involves the design, permitting, and construction management of a 187,000-gallon stormwater detention system. The system is intended to manage stormwater runoff for Belle Avenue area, ensuring compliance with local, state, and federal regulations related to stormwater management, sustainability, and flood prevention.

Contractor Award Amount Completion Last Updated

Matina & Son, Inc.

$ 1,004,435.00 11/06/2025 06/15/2026

EPA project closeout in process.

Last Updated: 06/15/2026

Working on the paperwork for final application.

Last Updated: 06/15/2026

Application was submitted. EPA grant agreement is received.